Saturday, December 11, 2010

Week Eleven

Week Eleven got a lot
of things done inside,
but not enough to
move in before Christmas.
They moved our move-in
date to the week
after Christmas.
The base and case
were all installed.
The stairs were finished
and all the cabinetry
was installed.

Kitchen cabinets.
Love them!

Mantel on the fireplace.
Love it!

Tile in the
master bathroom done.

Cabinetry in the
master bathroom.

Jack and Jill
cabinets in Hannah's
bathroom.

Cabinet in the laundry
room.  There will be a
sink on the one side
and then counter space.

The railing is all in.
It will be stained black.

Here is Jakson's closet.
I think it's bigger than
his bedroom.

2 comments:

  1. I think it might depend which one of the Trusty's wants to live in there!

    ReplyDelete